Abstract
The article notes that the risk-oriented approach to the planning and implementation of control measures being implemented at present sufficiently utilized in different areas of activity. Foreign experience shows that the shift to riskbased supervision model requires a high level of integration of databases, information systems planning control measures. In this regard, the task to transition to the risk-oriented model for monitoring involves conducting extensive work to prepare its prerequisites.